Stewart Projects

Request form

Please complete the form and submit per the instructions on the form.

Project Log

Please allow at least 14 business days for processing any request before contacting the Nevada Indian Commission or the SHPO. Proposed work must not begin until this form has been reviewed and approved by both the Nevada Indian Commission and the State Historic Preservation Office.                                                           

               Project Information (By Building Number)

Building #1 and Building #2 Asbestos Abatement request, pictures, contractor documents, drawingsNIC Approval, and 100% Final documents

Building #2 Welcome Center Proposal Cover Sheet, Construction Drawings, and Construction Specifications with SHPO reply letter  Final SHPO letter

Building #3 Concrete parking area request and review form with NIC Approval

Building #3 Clothes line removal request and review form with NIC Approval (signature page only)

Building #3 Sink replacement request and review form with NIC Approval (signature page only)

Building #3 and #4 Concrete replacement request  and review form with NIC Approval

Building #4 Remodel documentation and photographs and review form with NIC approval

Building #4 Sewer Repair request with NIC approval

Building #6 Mortar Repair Request documentation

Building #6 Drinking Fountain Repair request with NIC approval.

Building #11 Sidewalk and Patio Repair/Replacement request and review form with NIC approval.

Building #13 Tub Insert Replacement request and review form with NIC approval

Building #13 Floor Replacement and Painting (B & G project) request and review form with NIC approval

Building #13 Flooring Replacement and Kitchen Remodel request and review form with NIC approval

Building #17 Door Installation request and review form with NIC approval

Building #17 Electrical Installation request and review form with NIC approval

Building #18 Window Repair documentation and review form with NIC approval and State Lands Certification

Building #20 Clean Up request, table of contents, specifications, and asbestos/lead abatement  the SHPO reply letter

Building #20 Moisture Management request and review form with NIC Approval

Building #27, 28, 29, 30, and 31 Repaint, Repair Wood and Concrete request and review form with NIC Approval

Building #32 Sewer Repair request with NIC Approval

Building #44 Bathroom Rehabilitation request and review form with NIC Approval

Building #48 Gable Repair request and review form with NIC Approval

Building #84 Concrete Dock, Ramp, and Steps request and review form with NIC Approval

Building #89 Door Removal request and review form with NIC Approval

Building #94 Boiler Room / Bathroom Repair request and review form with NIC Approval

Building #107 Replace White Board with Smart TV request and review form with NIC Approval

Building #107 Replace Doors request and review form with NIC Approval

Building #107 Underground Electrical request and NIC Approval

Building #107 Window Sill Repair request and NIC Approval

Building #107 Wall Repair request and NIC Approval

Building #160 Repaint Gym Building request and review form with NIC Approval